Inspection and Acceptance of Primary Load-Bearing Welds on Heavy-Duty Aerial Lifting Platforms
All primary load-bearing welds on heavy-duty aerial lifting platforms undergo nondestructive testing (NDT). After welding, quality inspectors use magnetic particle testing or liquid penetrant testing and also visually inspect the welds.
Quality checks begin during pre-weld fit-up. Structural components such as the chassis frame and boom assembly are fitted and positioned according to the drawings. Inspectors verify the overall assembly dimensions, the center-to-center distances between pivot points, and the outrigger span. The spacing between the boom’s pivot points affects subsequent assembly, so inspectors check it against the drawings during fit-up. During welding, inspectors monitor welding current, voltage, and travel speed and check the shape of the weld bead.
After welding, the structural components are straightened as required by the manufacturing procedure. Slag, spatter, and oxide scale are removed from the weld surfaces. Inspectors check for surface defects such as porosity and undercut and perform NDT on the primary load-bearing welds. The workshop photo shows magnetic particle testing, with labels identifying the weld location and the magnetic particle indications on the test piece. If testing reveals a crack-like defect, the defect must be removed and the affected area rewelded and retested. The component may be released only after the repaired area passes reinspection.
When accepting delivery of the equipment, buyers can use the documentation provided at delivery to verify the inspection coverage and results by weld location. Where repairs were carried out, buyers can also review the results of the post-repair NDT.
Key words:
Previous Page
Share